Control Techniques Research and Testing Facility This new state of the art facility was built to enhance the services offered by Control Techniques. The project included the construction of offices, toilets and meeting rooms, together with
New Main Entrance and Associated Works This contract was awarded on a design and build basis for the new Main Entrance into the hospital. The main entrance was to include a new reception area, offices, meeting
New DT Classroom, Meole Brace School & Science college This project to form new DT classroom was originally to be built using traditional trench foundation footings to a sloping site with a beam and block floor to the height
Bicton CE Primary School ECO Room The work consisted of the construction of a timber frame building with a mono pitched seamed roof and associated electrical, mechanical, drainage and ground works. The new building was set
Little Sutton Primary School New extension to the existing primary school to form new enlarged entrance area along with a small extension to the rear of the school to provide a group room with
Teagues Bridge Primary School Multi-phase project to refurbish and extend the current school to include an additional three classrooms and hall extension. The phases were: Phase 1 – Three Class base Extension – traditional
Refurbishment and Extension, SC Building The works included 2 nr extensions and internal remodelling of the existing SC Building, to house the newly increased in size School of Engineering. The location of the building and
Innovation Centre, Harper Adams University This project involved the construction of a two storey Innovation Centre, incorporating office space, meeting rooms, laboratories, development and presentation kitchens, together with pilot plant production facilities. The 1500m2 building
Weston Building, Harper Adams University This Teaching Block was constructed on the site of the existing dairy and dutch barn. The university therefore wanted to replicate the design of the historical building within the new