Long Mountain C of E Primary School The project was to build two extensions to the existing school, form two new play areas and enlarge the parking area to the front of school. The rear extension was
Tarporley C of E Primary School The school culture of ‘Inspire, Achieve, Enjoy, Together.’ was embraced by the Pave Aways construction team when carrying out the modern project at Tarporley Church of England School. The project
Polytec Industrial Facility The Works comprised of the Design and Construction of a new build steel frame Industrial Facility for Manufacture and Painting of Vehicle Components. The Facility includes Offices, Staff Welfare, Specialised
Concord College Science Block We were involved at an early stage of design process, enabling us to ensure that the design was correct and the vision of the College could be realised. Following the
New Service Centre The project consists of the construction of a two storey steel frame and clad with a mixture of light weight cladding, polycarbonate rain screen, timber and brickwork panels, approximately 750sqm
Curlew Meadows A stunning collection totalling 40 properties consisting of two, three and four bedroom homes located amongst some of Shropshire’s finest countryside. Curlew Meadows in Baschurch, offers a range of stunning
Millbrook Primary School The works were comprised of the design and construction of a new Nursery Extension, internal alterations to the existing class bases and associated landscaping and canopy. The design intention was
Redevelopment of Shrewsbury Fire Station This was a complicated contract which was carried out on an existing fire station site – and where the fire service needed to remain fully operational for the duration of
New Office and Factory Space This project was the construction of a 1400m2 bespoke production facility for Zip Clip Limited, incorporating 470m2 of ground and first floor offices. Zip Clip specialise in the manufacture and