Sarn Passivhaus Houses This £1.3m development was the first Passivhaus development that had been built for the local authority and the first council homes to be constructed for 30 years.
Welshpool High School Changing Room and W.C Refurbishment The project was the refurbishment of the existing boys and girls shower rooms, WC facilities, changing rooms and cloak rooms. The works included: • demolition of walls • formation of
The Elms The project included the refurbishment of The Elms, a large three storey property with basement located at Rhosddu Road Wrexham for Betsi Cadwaladr University Health Board. The works included the
Nesscliff Training Camp, New Kitchen and Dining Facility Pave Aways Ltd have successfully completed the build of the new Kitchen and Dining facility at Nesscliff Training Camp for the Defence Infrastructure Organisation (DIO) and its industry partner Landmarc
Welshpool Primary School Work on the new Welshpool school started in July 2018 but came to a halt in March 2019 (week 27 of a 52 week build) when the main contractor, Dawnus
New Food Distribution Centre Castell Howell Distribution centre is a steel portal framed building with a masonry low level wall to office area and concrete shuttered walls to loading bays. The wall construction is
Cats Protection, Wrexham Cats protection is a commercial new build and demolition of the former fire station. It is of steel and traditional block and brick construction. It comprises of a trussed timber,
Shifnal Primary School This Project was to construct a KS2 Block which contained two classrooms, a General Purpose room, and two toilets. We also refurbished a toilet block and two further classrooms within
Long Mountain C of E Primary School The project was to build two extensions to the existing school, form two new play areas and enlarge the parking area to the front of school. The rear extension was