Concord College Science Block We were involved at an early stage of design process, enabling us to ensure that the design was correct and the vision of the College could be realised. Following the
Curlew Meadows A stunning collection totalling 40 properties consisting of two, three and four bedroom homes located amongst some of Shropshire’s finest countryside. Curlew Meadows in Baschurch, offers a range of stunning
Millbrook Primary School The works were comprised of the design and construction of a new Nursery Extension, internal alterations to the existing class bases and associated landscaping and canopy. The design intention was
Redevelopment of Shrewsbury Fire Station This was a complicated contract which was carried out on an existing fire station site – and where the fire service needed to remain fully operational for the duration of
New Main Entrance and Associated Works This contract was awarded on a design and build basis for the new Main Entrance into the hospital. The main entrance was to include a new reception area, offices, meeting
New DT Classroom, Meole Brace School & Science college This project to form new DT classroom was originally to be built using traditional trench foundation footings to a sloping site with a beam and block floor to the height
Bicton CE Primary School ECO Room The work consisted of the construction of a timber frame building with a mono pitched seamed roof and associated electrical, mechanical, drainage and ground works. The new building was set
Innovation Centre, Harper Adams University This project involved the construction of a two storey Innovation Centre, incorporating office space, meeting rooms, laboratories, development and presentation kitchens, together with pilot plant production facilities. The 1500m2 building
Weston Building, Harper Adams University This Teaching Block was constructed on the site of the existing dairy and dutch barn. The university therefore wanted to replicate the design of the historical building within the new