Shifnal Primary School This Project was to construct a KS2 Block which contained two classrooms, a General Purpose room, and two toilets. We also refurbished a toilet block and two further classrooms within
Long Mountain C of E Primary School The project was to build two extensions to the existing school, form two new play areas and enlarge the parking area to the front of school. The rear extension was
Tarporley C of E Primary School The school culture of ‘Inspire, Achieve, Enjoy, Together.’ was embraced by the Pave Aways construction team when carrying out the modern project at Tarporley Church of England School. The project
Concord College Science Block We were involved at an early stage of design process, enabling us to ensure that the design was correct and the vision of the College could be realised. Following the
Millbrook Primary School The works were comprised of the design and construction of a new Nursery Extension, internal alterations to the existing class bases and associated landscaping and canopy. The design intention was
New DT Classroom, Meole Brace School & Science college This project to form new DT classroom was originally to be built using traditional trench foundation footings to a sloping site with a beam and block floor to the height
Bicton CE Primary School ECO Room The work consisted of the construction of a timber frame building with a mono pitched seamed roof and associated electrical, mechanical, drainage and ground works. The new building was set
Little Sutton Primary School New extension to the existing primary school to form new enlarged entrance area along with a small extension to the rear of the school to provide a group room with
Teagues Bridge Primary School Multi-phase project to refurbish and extend the current school to include an additional three classrooms and hall extension. The phases were: Phase 1 – Three Class base Extension – traditional