Helsby High School Existing portacabins have been demolished and we have built a new four-classroom block in their place at Helsby High School. The School’s new single-storey extension was handed over in time
Welshpool High School Changing Room and W.C Refurbishment The project was the refurbishment of the existing boys and girls shower rooms, WC facilities, changing rooms and cloak rooms. The works included: • demolition of walls • formation of
Refurbishment and Extension, SC Building The works included 2 nr extensions and internal remodelling of the existing SC Building, to house the newly increased in size School of Engineering. The location of the building and
Innovation Centre, Harper Adams University This project involved the construction of a two storey Innovation Centre, incorporating office space, meeting rooms, laboratories, development and presentation kitchens, together with pilot plant production facilities. The 1500m2 building
Weston Building, Harper Adams University This Teaching Block was constructed on the site of the existing dairy and dutch barn. The university therefore wanted to replicate the design of the historical building within the new