Oxon Primary School This project involved the extension of the existing school hall under a JCT Design and Build Contract, completed over a 30-week period. Key works included expanding the hall space, mechanical
Packwood Haugh School We successfully completed a comprehensive project to revolutionize the science facilities at Packwood Haugh School in Ruyton-XI-Towns. The project began with the meticulous demolition of the existing single-story science labs,
Headley Court Veterans’ Orthopaedic Centre This landmark project involved delivering a new state-of-the-art building designed with a familiar military feel for Armed Forces veterans to receive specialist care.
Riggs Hall, Shrewsbury School The final outcome of this project resulted in a sympathetically restored boarding house with much-needed additional accommodation that transported the building to the modern era, ensuring its purpose for years to come.
Haughmond Federation, Shrewsbury The latest in a new generation of Shropshire schools has been unveiled following our completion of this project to provide more sustainable education facilities in the county.
Nesscliff Training Camp, New Kitchen and Dining Facility Pave Aways Ltd have successfully completed the build of the new Kitchen and Dining facility at Nesscliff Training Camp for the Defence Infrastructure Organisation (DIO) and its industry partner Landmarc
New Food Distribution Centre Castell Howell Distribution centre is a steel portal framed building with a masonry low level wall to office area and concrete shuttered walls to loading bays. The wall construction is
Shifnal Primary School This Project was to construct a KS2 Block which contained two classrooms, a General Purpose room, and two toilets. We also refurbished a toilet block and two further classrooms within
Long Mountain C of E Primary School The project was to build two extensions to the existing school, form two new play areas and enlarge the parking area to the front of school. The rear extension was