Live Wellington Leisure Centre & Civic Centre Decarbonisation A major project is underway at Wellington Civic & Leisure Centre to decarbonise the existing swimming pool and enhance its energy efficiency. This initiative aims to reduce energy costs while
Live 1 Walker Street Pave Aways is pleased to be at the forefront of restoring Wellington’s former YMCA building at 1 Walker Street, a key part of Telford & Wrekin Council’s vision to regenerate
Live Wrexham University Science Engineering Refurbishment The project will see the relocation of the engineering faculty into the existing building, optimising the use of underutilised rooms and enhancing their integration with the rest of the building
Live Huxley Laboratory Refurbishment, Keele University Pave Aways is delivering a comprehensive refurbishment of the Huxley Laboratory, a project that will significantly enhance the facility’s capabilities. This project involves a two-phase approach. Phase one will consist
Live Oakengates Leisure Centre Gym Refrubishment Phase One of the refurbishment at Oakengates Leisure Centre includes bringing new life to the gym by replacing old windows with sleek curtain walling sections and removing the asbestos
Oxon Primary School This project involved the extension of the existing school hall under a JCT Design and Build Contract, completed over a 30-week period. Key works included expanding the hall space, mechanical
Live Ercall Wood Academy This project will see a new three-storey science block building, a single-storey dining hall extension and internal refurbishments to ground floor classrooms and staircase areas. Start date – 24th March
Staffordshire History Centre & William Salt Library This project delivered key improvements to enhance capacity, functionality, and aesthetics. We constructed a new concrete frame extension, overhauled mechanical and electrical systems for efficiency and sustainability, transformed the courtyard with a glazed canopy and landscaping, and sensitively refurbished the Grade II* Listed William Salt Library. The refurbishment preserved the library’s historical character while integrating modern facilities, ensuring its continued use for future generations.
Helsby High School Existing portacabins have been demolished and we have built a new four-classroom block in their place at Helsby High School. The School’s new single-storey extension was handed over in time